RA bill templates for contractors

Ten formats from a running account bill package, each with its columns, rows filled from one work order and tips from billing practice. Download any of them as CSV for Excel.

Templates
10
Format
CSV, opens in Excel
Sample work order
PWD ward office, RA 7
Price
Free, no sign-up

Ten templates. One bill package.

  • RA bill abstract of cost

    The abstract of cost for a running account bill: every BOQ item with its up-to-date, previous and this-bill quantities and the amount for this bill.

    CSV
  • Detailed measurement sheet

    A detailed measurement sheet in the measurement book layout: date, BOQ item, location, nos, L, B, D and quantity, with the drawing reference for each row.

    CSV
  • Deviation statement

    A deviation statement listing each BOQ item with its BOQ quantity, executed and anticipated quantity, excess or saving, the amount and the reason.

    CSV
  • Extra item statement with rate analysis

    An extra and substituted item statement: description, unit, quantity, the basis of the rate, the rate, the amount and the approval reference.

    CSV
  • Recovery schedule, gross to net

    The recovery schedule of an RA bill, line by line from the value of work done to the net payable, with the basis and configured rate of each line.

    CSV
  • Secured advance register

    A register of materials brought to site against which secured advance was paid, and how much of the advance is recovered as the material is used.

    CSV
  • Cement and steel reconciliation

    A reconciliation of client-issued steel or cement: issued, at site, consumed, theoretical consumption, the permitted variation and any recovery for excess.

    CSV
  • BBS to weight sheet

    A bar bending schedule that works out the weight of reinforcement: member, bar mark, diameter, nos, cut length and standard weight per metre.

    CSV
  • Retention release letter and annex

    A letter asking for release of retention money after the defect liability period, with an annex of retention deducted bill by bill.

    CSV
  • Delayed payment interest claim

    A claim for interest on delayed payment under the MSMED Act: bill, amount, acceptance, due date, payment date, days late and compound interest at three times the bank rate.

    CSV

The same bill, built from measurements

The templates are the sheets Tatha Vastu produces for every RA bill. In the product, the abstract fills itself from approved measurements, and the previous column comes from the last certified bill.

  • No retyped quantities between sheets
  • Recoveries at your contract’s configured rates
  • Every line traceable to its measurement

See the RA bill generator