CPWD and state PWD formats built in

RA bill generator for civil contractors

Approve the month's measurements and Tatha Vastu builds the full RA bill package, from the abstract of cost to the tax invoice, in your client's format.

What every bill package holds

Abstract of cost

Item, description, unit, BOQ quantity and rate, then up-to-date, previous and this-bill quantities with the amount. The previous column comes from the last bill, never retyped.

Bill formats by client. Built in, or built for you.

ClientWhat the bill followsSet up
CPWDAbstract with up-to-date, previous and this-bill columns, measurements by MB pageBuilt in
State PWDThe division’s abstract layout and order of recoveriesBuilt in
Indian RailwaysThe schedule-wise abstract your division issuesFrom one past bill
NHAI and state highwaysChainage and layer-wise quantities against the contract BOQFrom one past bill
Developer or PMCThe PMC’s own workbook, with its item codesFrom one past bill
Municipal corporationsThe corporation’s bill layout, with its MB referencesFrom one past bill
Industrial and PSUPurchase order lines, with the PO number on every pageFrom one past bill

Formats built from a past bill are set up during onboarding, at no charge on Growth.

Part-rate and on-account payments

Bill work that is done but not finished at a reduced rate the engineer has approved. The balance stays on the item until it is released at the full rate.

  • Part rate as a per cent or an amount
  • Approval reference kept on the line
  • Balance carried bill to bill

Final bill mode. Everything closed, nothing left open.

1

Closes every quantity

Up-to-date quantities become final, each with its excess or saving against BOQ.

Final bill/QuantitiesClosed
ItemBOQFinalDiff
1.11,240.001,186.40-53.60
3.2468.00486.7018.70
5.4230.00221.50-8.50
6.13,900.003,900.000.00
2

Reconciles advances and material

Advances run down to nil, and issued cement and steel are checked against theoretical use.

Final bill/AdvancesReconciled
  • Mobilisation advance, balance0
  • Secured advance, balance0
  • Cement issued4,850 bags
  • Cement, theoretical4,792 bags
  • Excess to recover58 bags
3

Schedules retention release

Retention held across all bills, with its release date from the defect liability period.

Final bill/RetentionScheduled
  • Gross value, all bills2,49,37,000
  • Retention held, 5%12,46,850
  • Defect liability ends31 Mar 2028
  • Release due31 Mar 2028

Questions

What billing engineers ask about the generator.

Contact the billing team

How long does a bill take once measurements are approved?

Generating the package takes minutes. Most of the month's work is checking the approved measurements, which happens through the month instead of at the cut-off.

Can the abstract follow our client's exact columns?

Yes. CPWD and state PWD layouts are built in. For any other client, send one past bill and we build its format during onboarding.

What if the previous bill was made in Excel?

Import its up-to-date quantities when you set up the work order. The next bill's previous column starts from them.

Can we edit a bill after it is generated?

Change the measurement or the recovery behind it and regenerate. Every version is kept with who changed what, so the client sees one clean bill.

Does Tatha Vastu certify the bill?

No. Certification stays with the client's engineer-in-charge. Tatha Vastu makes the bill easy to check, line by line.