Closes every quantity
Up-to-date quantities become final, each with its excess or saving against BOQ.
| Item | BOQ | Final | Diff |
|---|---|---|---|
| 1.1 | 1,240.00 | 1,186.40 | -53.60 |
| 3.2 | 468.00 | 486.70 | 18.70 |
| 5.4 | 230.00 | 221.50 | -8.50 |
| 6.1 | 3,900.00 | 3,900.00 | 0.00 |
CPWD and state PWD formats built in
Approve the month's measurements and Tatha Vastu builds the full RA bill package, from the abstract of cost to the tax invoice, in your client's format.
Item, description, unit, BOQ quantity and rate, then up-to-date, previous and this-bill quantities with the amount. The previous column comes from the last bill, never retyped.
Every abstract line has its sheet: each entry's date, location, MB page and photos, adding up to the line's quantity.
Projected final quantity against BOQ, item by item, with the reason and drawing reference. Extra and substituted items follow on their own statement.
Retention, advances, secured advance, cess, TDS and GST TDS, applied as set for the work order, down to net payable.
SAC, place of supply and GST at the rate configured for the work order. Where e-invoicing applies, the IRN and QR code print on it.
A covering letter to the engineer-in-charge listing the enclosures, and an entry in your bill register to track the inward number.
| Item | Description | Unit | This bill | Amount ₹ |
|---|---|---|---|---|
| 1.1 | Earthwork in excavation, foundation | cum | 165.30 | 41,077.05 |
| 2.3 | PCC 1:4:8, 40 mm aggregate | cum | 14.25 | 91,371.00 |
| 3.2 | RCC M25 in slabs and beams | cum | 74.20 | 6,65,203.00 |
| 4.1 | Reinforcement, Fe 500D | kg | 9,745 | 7,64,008.00 |
| 5.4 | Brickwork 1:6, superstructure | cum | 36.50 | 2,59,880.00 |
| Date | Location | Qty |
|---|---|---|
| 7 Oct | Columns C1 to C12, floor 5 | 9.86 |
| 12 Oct | Slab S1 and beams | 21.40 |
| 19 Oct | Slab S2 and beams | 20.75 |
| 24 Oct | Staircase flights, floor 5 | 8.25 |
| 28 Oct | Slab S3, bay 2 to 4 | 13.94 |
| Item | Description | Excess | Saving | Amount ₹ |
|---|---|---|---|---|
| 3.2 | RCC M25 in slabs and beams, cum | 18.70 | 1,67,645.50 | |
| 7.3 | Vitrified tile flooring, sqm | 156.00 | 1,84,080.00 | |
| 1.1 | Earthwork in excavation, cum | 53.60 | -13,319.60 | |
| 5.4 | Brickwork 1:6, cum | 8.50 | -60,520.00 |
Work: Ward office building, Hadapsar. Period of work done: 1 to 31 October 2026.
Value of work done this bill ₹20,84,879. Net payable after recoveries and GST ₹18,49,293.
Enclosed: abstract of cost, measurement sheets (MB pages 38 to 44), deviation statement, recovery schedule and tax invoice.
| Client | What the bill follows | Set up |
|---|---|---|
| CPWD | Abstract with up-to-date, previous and this-bill columns, measurements by MB page | Built in |
| State PWD | The division’s abstract layout and order of recoveries | Built in |
| Indian Railways | The schedule-wise abstract your division issues | From one past bill |
| NHAI and state highways | Chainage and layer-wise quantities against the contract BOQ | From one past bill |
| Developer or PMC | The PMC’s own workbook, with its item codes | From one past bill |
| Municipal corporations | The corporation’s bill layout, with its MB references | From one past bill |
| Industrial and PSU | Purchase order lines, with the PO number on every page | From one past bill |
Formats built from a past bill are set up during onboarding, at no charge on Growth.
Bill work that is done but not finished at a reduced rate the engineer has approved. The balance stays on the item until it is released at the full rate.
Up-to-date quantities become final, each with its excess or saving against BOQ.
| Item | BOQ | Final | Diff |
|---|---|---|---|
| 1.1 | 1,240.00 | 1,186.40 | -53.60 |
| 3.2 | 468.00 | 486.70 | 18.70 |
| 5.4 | 230.00 | 221.50 | -8.50 |
| 6.1 | 3,900.00 | 3,900.00 | 0.00 |
Advances run down to nil, and issued cement and steel are checked against theoretical use.
Retention held across all bills, with its release date from the defect liability period.
Generating the package takes minutes. Most of the month's work is checking the approved measurements, which happens through the month instead of at the cut-off.
Yes. CPWD and state PWD layouts are built in. For any other client, send one past bill and we build its format during onboarding.
Import its up-to-date quantities when you set up the work order. The next bill's previous column starts from them.
Change the measurement or the recovery behind it and regenerate. Every version is kept with who changed what, so the client sees one clean bill.
No. Certification stays with the client's engineer-in-charge. Tatha Vastu makes the bill easy to check, line by line.