Warns at 80% of BOQ
An alert reaches the billing engineer and project manager as each item crosses 80%, then 100%.
- 7.3 Vitrified tile flooring1,456 of 1,300 sqm · 112%Over BOQ
- 1.1 Excavation, foundation1,186.40 of 1,240 cum · 96%Past 80%
- 3.2 RCC M25 in slabs412.80 of 468 cum · 88%Past 80%
- 5.4 Brickwork 1:6188.40 of 230 cum · 82%Past 80%