Extra item statement template for contractors

An extra and substituted item statement: description, unit, quantity, the basis of the rate, the rate, the amount and the approval reference.

Columns and filled rows

All 9 columns, filled from one work order so the arithmetic can be checked. The download opens in Excel, Google Sheets or LibreOffice.

Download the template

When the extra item statement is used

When work is ordered that is not in the BOQ (an extra item) or replaces a BOQ item with a different specification (a substituted item).

  • Get the instruction in writing before the work is done, and quote it in the approval column.
  • Build the rate the way your contract asks: from the SOR where a similar item exists, otherwise from market rates with quotations.
  • Show a substituted item against the BOQ item it replaces, so the saving on the old item is clear.