Client type: Highways
RA bill software for highway contractors
Item-rate highway contracts bill by chainage and layer. Many NHAI projects are EPC or hybrid annuity and bill by stage; Tatha Vastu fits the BOQ contracts.
Recoveries that usually apply
Each one is configured once for the work order, at the rate or amount your contract sets, and applied the same way on every bill.
- Retention, as the contract sets it
- Mobilisation and equipment advances with their interest
- Building and other construction workers welfare cess
- Income-tax TDS, and GST TDS where the client must deduct it
- Price adjustment by index formula, where the contract has it
- Value of work done, this bill20,84,879
- Retention, 5%- 1,04,244
- Mobilisation advance recovery- 1,50,000
- Interest on advance- 12,375
- Secured advance adjusted- 2,40,000
- Labour welfare cess, 1%- 20,849
- Income-tax TDS, 2%- 41,698
- GST TDS, 2%- 41,698
- GST on the invoice, 18%+ 3,75,278
- Recoveries, 7 lines- 6,10,864
- Net payable₹18,49,293
Why bills come back. And what Tatha Vastu does about each.
Returned forHow Tatha Vastu handles it
A layer billed before the layer below it is acceptedLayers are entered in order per chainage stretch, and a layer bills only over an accepted one.
Chainages that overlap the previous billChainage stretches already billed are blocked from a second entry.
Earthwork cross-sections without their initial levelsCross-section areas import with the survey levels they were worked from.
Thickness billed above the design with no approvalThickness is capped at the design value unless an approval reference is entered.
Checked line by line in the bill room
The Highways engineer opens any line, sees its measurement and photo, then certifies it, certifies part or holds it with a reason. Certification stays with them.
- Free for the client's engineer
- Every cut logged with who made it and why
3.2RCC M25 in slabs, 74.20 cumQuery
Executive Engineer · 2 Nov, 11:05
Slab S3 depth reads 150 mm. Drawing S-104 shows 125 mm. Please confirm.
Site engineer · 2 Nov, 11:40
Revised drawing S-104 R2, 14 Sept, attached with the measurement photo.
Certify 74.20 cumCertify partHold